Custom Built Garden Rooms, Cabins and Timber Buildings
  • Home
  • About Me
  • Gallery
  • Cabin KITS
    • Kit-Quote
  • Bespoke Cabins
    • Triangular Cabin - Guildford
    • Garden Annex
    • Garden Office
    • Pool House
    • Log Cabins
    • Garden Gym
    • Garden Studios
    • Bluebell Cottage - Little Bookham
    • Garden Summerhouses
    • Garden Room
    • Mini Cabins
    • Tree House
    • Cabin Extras and Upgrades
  • Standard sizes
  • Bespoke Garden Sheds
    • Chicken Coop - Cluckingham Palace
    • Shed Spec
    • Claygate-Potting Shed
    • Garden Sheds
    • Timber Garages
    • Garage Makeover
    • Cycle/Bike shed
    • Workshops
    • Boat House
    • Oak Carports
    • Front Door Porch
  • Contact
  • Price Guide
  • Extras
  • Blog
  • Insurance
  • Linear Metre Calculator
  • Flintstone Kitchen

Laying a concrete base

12/2/2017

 
Vertical Divider
Concrete base set-outConcrete base set-out
The secret to laying a perfectly flat concrete base is in the prep work. Don’t be tempted to save a couple of pounds on materials thinking the base will turn out how we want it.
 
Firstly, the area doesn’t necessarily need to be dug out first and hard-core laid as long as the ground is nice and firm.  Using re-bar in the concrete will give the base the strength needed.
 
Map out the area of the cabin size. i.e.: a 6m x 4m cabin needs a base of 6 meters by 4 meters exactly believe it or not. Please don’t add a few inches for good measure., we want the cladding to overlap the base so the rain can’t get under the cabin.

Picture
Using 6”x2” timber (150mm x 47mm), Make the up stands in a rectangle so the inside measurements are the same as the cabin size (the concrete area). Cut pegs using 2”x2” timber (47mm x 47mm) with a point at one end. For best results, dig holes for the pegs and concrete them in at least 15 inches down. You can cut the pegs out below ground after and remove them. Be sure to use 6” x 2” timber for the up stands. PLY WILL NOT DO, it will bend under the weight of the wet concrete and the base will have a dip in it. Also, be sure to use pegs of at least 2”x2”, BATTEN WILL NOT DO.
The corner-to-corner measurement is very important to make sure the base is square. Measure diagonally corner-to-corner and be sure they are equal (give or take 5 mm). ie: a 4m x 6m base should measure approx 7210mm corner to corner in both directions.
Make sure the up stands are level using a long spirit level or a laser level if possible.

Vertical Divider
For the best finish and an easier job, I tend to order concrete from a ready mix company and hire a pump also. For the extra £300, it is worth it. They can pump up to 150 feet but check with the company first. Ask for the mix to be quite wet, once it is poured it is easier to level and the result is far better, a bit like a frozen lake.

While the concrete is being pumped, place lengths of re-bar in the concrete about 2” in from the up stands and over lapping in the corners. Ideally place 2 layers of re-bar all the way round the outside of the base. One about 2” off the ground and the second at about 4” off the ground directly over the first.  That forms the strength in the base.
For soft ground, its best to use Reinforcing Mesh sheets and cover the whole area.
Re-Bar
Lengths of Re-Bar
Reinforcing Mesh sheets
Reinforcing Mesh sheets
Important
Be sure to wear waterproof boots and gloves, CEMENT BURNS.
Tamping wet concrete base
Tamping wet concrete base
Wet concrete base
Wet concrete base

Comments are closed.

    Author

    Award Winning Designer/Builder of Tiny Houses and Timber Cabins.
    Follow me on:

    Picture

    Archives

    February 2022
    November 2018
    September 2018
    December 2017
    November 2017
    February 2015
    January 2015
    December 2014
    September 2014
    August 2014
    July 2014
    May 2014
    December 2011
    September 2011
    August 2011
    February 2011
    October 2010
    September 2010

    Categories

    All
    Bespoke
    Building
    Cabin
    Concrete Base
    Dog
    Garage
    Garden
    Garden Room
    Groundwork
    Kennel
    Pool House

    RSS Feed

Mark BurtonMark Burton
Workshop (Not a showroom)
Tiny House Cabins
Horse Ghylls Farm,
Capel Road, Horsham,
West Sussex,
RH12 4PZ.
Tel: 01306 302 306


Email
PLEASE NOTE: Our email address has changed. 13/09/22
Award Winning Designer/Builder of Tiny Houses & Bespoke Timber Cabins.
All material and content Copyright © 2019 Mark Burton. All rights reserved.
Registered with the UK Copyright Service.
Designs Registration No-284655164
  

All prices are subject to VAT at 20%.
VAT number: 263 5042 22

Tiny House Cabins Logo
Tiny House Logo
Tiny House ® registered Trade Mark

Surrey and parts of Berkshire, Hampshire, Buckinghamshire, Middlesex, East and West Sussex, Oxfordshire and West London.